1.     Professional design solutions much as possible to provide the best solution at the lowest cost. The engineering team cooperates with customers to provide on-site investigation, on-site training and project technical guidance.

2.     The special access port The special access port can pass through a 36cm aperture by tightening the folding frame that is simply bundled. Each section is compact and lightweight, weighing no more than 50kg.

3.     Folding quick-connect scaffolding system The folding frame components can be quickly assembled and disassembled to form a 2m cubic structure, which are locked together to form the main tower structure of the scaffolding. Separate ladders and access platforms are installed on each floor.

4.     The installation of the structural foundation is quick and easy The installation of the basic structure is simple and fast, without the use of tools. Designed and installed according to the boiler V-shaped ash hopper, it provides a solid foundation for the entire superstructure.

5.     Tool-free installation Quick-install furnace maintenance scaffolding does not require welding and tools. The entire structure adopts hanging brackets and quick-installation combined beam. All components are interconnected and locked using sleeves and fasteners. The inspection platform and bridge frame are directly locked on the components of the folding frame.

BOILER SCAFFOLDING SYSTEM